Discount wholesale Plastic Panel Making Machine - Plastic recycling machine PPpe washing crushing drying line – WOOD-PLASTIC Detail:
PP PE washing/crushing/drying line
General information
1) Capacity: 300-400kg/h
2) Voltage required: 380V 50HZ 3P or as per client’s requests
3) Machine plate color: May as per client’s requests
Machine list and total price
No. |
Machine Name |
Qty |
Belt conveyer | 1set | |
Crusher with water | 1 set | |
Screw conveyer | 1 set | |
Friction washer | 1 set | |
Floating washing tank | 1 set | |
Screw conveyer | 1 set | |
Dewatering machine | 1 set | |
Silo | 2 set | |
Electrical panel | 1 set |
Brief Introduction
HGMS series plastic cleaning machine is designed to clean recycled plastic woven sack and plastic farm film,the machine is widely used for PP,PE,PET plastic cleaning and plastic bottle cleaning,Developing on the basis of advanced technology,the machine has advantage of stable performance,high output,energy efficiency,small floor area and good appearance,We can produce the machine according to client requirement.
Layout drawing
Product detail pictures:
Related Product Guide:
PVC Pipes – Types of PVC Pipes and Their Usage
Why Do People Prefer PVC Pipes For Various Purposes
Our focus on should be to consolidate and enhance the quality and repair of present products, in the meantime constantly establish new products to meet unique customers' requires for Discount wholesale Plastic Panel Making Machine - Plastic recycling machine PPpe washing crushing drying line – WOOD-PLASTIC, The product will supply to all over the world, such as: Comoros, Slovak Republic, Curacao, Adhering to the principle of Enterprising and Truth-Seeking, Preciseness and Unity, with technology as the core, our company continues to innovate, dedicated to providing you with the high cost-effective products and meticulous after-sales service. We firmly believe that: we are outstanding as we are specialized.
1, WARRANTY TERMS:
1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE
1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.
2, DELIVERY CONDITIONS:
2.1 DELIVERY CONDITION: FOB QINGDAO PORT.
2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
2.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.
3, INSPECTION:
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.
4, INSTALLATION AND EQUIPMENT COMMISSIONING:
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.
If any interest to our machines, please kindly feel free to contact us:
Email: info@tongsanextruder.com info@wpcmachinery.com
Phone: 0086-13953226564
TEL:0086-532-82215318
Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China
By Gustave from Bulgaria - 2017.07.07 13:00
This is the first business after our company establish, products and services are very satisfying, we have a good start, we hope to cooperate continuous in the future!
By Albert from San Francisco - 2018.12.10 19:03