Factory Cheap Wpc Decking Machine - PE PP PPR pipe machine PE gas pipe making machine – WOOD-PLASTIC Detail:
Gas and water supplying pipe extrusion line is used for producing wanter and gas supplying pipe
have the feature of heat resistance ,anti-aging,strong mechanical strength,resistance to environment stress fracture and squirm,etc.
the technical parameter following the below:
|
SJ-65B |
SJ-90B |
SJ-120B |
SJ-150B |
MAX. specification |
110 |
200 |
400 |
630 |
Marking line machine model |
SJ-25 |
SJ-30 |
SJ-30 |
SJ-30 |
Max.output |
90-180 |
200-320 |
320-500 |
550-700
|
Product detail pictures:
Related Product Guide:
The Insider Scoop on a Vacuum Formable Plastic Sheet
PVC Pipes Measurements
We retain bettering and perfecting our merchandise and service. At the same time, we do the job actively to do research and improvement for Factory Cheap Wpc Decking Machine - PE PP PPR pipe machine PE gas pipe making machine – WOOD-PLASTIC, The product will supply to all over the world, such as: Uzbekistan, Burundi, Comoros, Our advantages are our innovation, flexibility and reliability which have been built during last 20 years. We focus on providing service for our clients as a key element in strengthening our long-term relationships. The continual availability of high grade products in combination with our excellent pre- and after-sales service ensures strong competitiveness in an increasingly globalized market.
1, WARRANTY TERMS:
1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE
1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.
2, DELIVERY CONDITIONS:
2.1 DELIVERY CONDITION: FOB QINGDAO PORT.
2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
2.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.
3, INSPECTION:
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.
4, INSTALLATION AND EQUIPMENT COMMISSIONING:
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.
If any interest to our machines, please kindly feel free to contact us:
Email: info@tongsanextruder.com info@wpcmachinery.com
Phone: 0086-13953226564
TEL:0086-532-82215318
Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China
By Emily from Florence - 2017.09.29 11:19
Cooperate with you every time is very successful, very happy. Hope that we can have more cooperation!
By Jack from Italy - 2018.09.08 17:09