Factory directly 25$) – Wood Wpc Doors - PE PP PPR pipe machine PE electric conduit making machine – WOOD-PLASTIC

Short Description:

Product Description Introduction of plastic corrugated pipe extrusion line Plastic single-wall corrugated pipe extrusion line can be used to produ...


Product Detail

Service and support

Inquiry and contact

Product Tags

Related Video

Feedback (2)

The purchaser fulfillment is our primary focus on. We uphold a consistent level of professionalism, high quality, credibility and service for Wpc Profile Extruder Making Machine, Pvc Pipe Beveling Machine, Pp Sheet Making Machine, We welcome you to join us in this path of creating a prosperous and efficient business together.
Factory directly 25$) – Wood Wpc Doors - PE PP PPR pipe machine PE electric conduit making machine – WOOD-PLASTIC Detail:

Product Description
Introduction of plastic corrugated pipe extrusion line

Plastic single-wall corrugated pipe extrusion line can be used to produce corrugated pipes of PE,PP,EVA,PVC continuously, as well as PA corrugated pipes. Plastic single wall corrugated pipes have features of high temperature resistance, corrosion and abrasion resistance, high intensity and good flexibiliry, etc.

Plastic pipe extrusion line character 

Plastic single-wall corrugated pipe production line developed by our copany adopts gears to run moulds and templates so as to realize water circulating cooling and air cooling of the products, which ensures high-speed molding, even corrugation, smooth inner and outer pipe well.

The main technique parameter
Mode of extruder SJ30 SJ-50 SJ65
Pipe diameter range 4.5-9mm 9-32mm 16-50mm
L/D of screw 30:1 30:1 30:1
Production capacity 10kg/h 30-40kg/h 50
Power of extruder 4kw 15kw 18.5kw
Power of forming machine 1.1kw 1.5kw 2.2kw
Pairs of modules 50pairs 50pairs 50pairs
Cooling mode water cooling &fan cooling water cooling &fan cooling water cooling&fan cooling
Production speed 8-12m/min 8-12m/min 8-12m/min
Coiling mode auto double winder auto double winder auto double winder

.


Product detail pictures:

Factory directly 25$) – Wood Wpc Doors - PE PP PPR pipe machine  PE electric conduit making machine – WOOD-PLASTIC detail pictures


Related Product Guide:
PVC Pipes – Types of PVC Pipes and Their Usage
Why Do People Prefer PVC Pipes For Various Purposes

Our commission should be to provide our end users and clients with very excellent and aggressive portable digital products and solutions for Factory directly 25$) – Wood Wpc Doors - PE PP PPR pipe machine PE electric conduit making machine – WOOD-PLASTIC, The product will supply to all over the world, such as: Indonesia, Denver, Malta, we rely on own advantages to build a mutual-benefit commerce mechanism with our cooperative partners. As a result, now we have gained a global sales network reaching the Middle East, Turkey, Malaysia and Vietnamese.

1, WARRANTY TERMS: 

1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE

1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.

1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.

2, DELIVERY CONDITIONS:

2.1 DELIVERY CONDITION: FOB QINGDAO PORT.

2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF  ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.

2.3 SUPERVISION OF LOADINGTHE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.

3, INSPECTION: 

WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST  FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.

4, INSTALLATION AND EQUIPMENT COMMISSIONING: 

IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.

If any interest to our machines, please kindly feel free to contact us:

Email: info@tongsanextruder.com       info@wpcmachinery.com

Phone: 0086-13953226564
TEL:0086-532-82215318

Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China

  • The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
    5 Stars By Elizabeth from Iran - 2018.12.05 13:53
    Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.
    5 Stars By Karen from London - 2018.12.28 15:18
    WhatsApp Online Chat !