Factory Outlets Pp Plastic Winding Pipe Production Line - PE PP PPR pipe machine PE multi-layer pipe making machine – WOOD-PLASTIC Detail:
Item | Quantity |
SJ-65×30 single screw extruder | two set |
Die And Mould | one set |
TSG-B Stainless steel cooling | two set |
TSG-A Kinking machine | one set |
Flat traction engine | one set |
Winer | one set |
Product detail pictures:
Related Product Guide:
Acrylic Plastic Sheets
The Insider Scoop on a Vacuum Formable Plastic Sheet
With a complete scientific quality management system, good quality and good faith, we win good reputation and occupied this field for Factory Outlets Pp Plastic Winding Pipe Production Line - PE PP PPR pipe machine PE multi-layer pipe making machine – WOOD-PLASTIC, The product will supply to all over the world, such as: India, Myanmar, Argentina, Ensuring high product quality by choosing nice suppliers, we have also implemented comprehensive quality control processes throughout our sourcing procedures. Meanwhile, our access to a large range of factories, coupled with our excellent management, also ensures that we can quickly fill your requirements at the lower prices, regardless the order size.
1, WARRANTY TERMS:
1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE
1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.
2, DELIVERY CONDITIONS:
2.1 DELIVERY CONDITION: FOB QINGDAO PORT.
2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
2.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.
3, INSPECTION:
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.
4, INSTALLATION AND EQUIPMENT COMMISSIONING:
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.
If any interest to our machines, please kindly feel free to contact us:
Email: info@tongsanextruder.com info@wpcmachinery.com
Phone: 0086-13953226564
TEL:0086-532-82215318
Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China
By Zoe from Tanzania - 2018.07.27 12:26
The company can keep up with the changes in this industry market, product updates fast and the price is cheap, this is our second cooperation, it's good.
By Maria from Haiti - 2018.12.25 12:43