Factory Price For Cost Of Plastic Recycling Machine - Wood Plastic WPC machine WPC board machine – WOOD-PLASTIC Detail:
WPC foam board production line
WPC board extrusion line for making furniture board
wpc foam board extrusion line
Three layer WPC foam board co-extrusion line
PVC foam board making machine
WPC machine for WPC PVC foam board production line
PVC WPC board machine
Item
|
Description
|
Product size
|
1220mm width, length can cut at any length
|
Product thickness
|
3-30mm (ABA three layer, B is foamed layer, A is unfoaming layer)
|
Product application
|
Furniture board, kitchen cabinet, construction formwork
|
Density
|
0.45-0.8ton/m3
|
Raw material
|
PVC+wood+caco3+chemical additives
|
Finishing surface
|
Laminating, hot stamping, printing, painting
|
Product detail pictures:
Related Product Guide:
Acrylic Plastic Sheets
The Insider Scoop on a Vacuum Formable Plastic Sheet
Our rewards are reduce selling prices,dynamic revenue team,specialized QC,sturdy factories,superior quality services for Factory Price For Cost Of Plastic Recycling Machine - Wood Plastic WPC machine WPC board machine – WOOD-PLASTIC, The product will supply to all over the world, such as: Nigeria, Cologne, moldova, Our organization. Situated inside the national civilized cities, the visitors is very easy, unique geographical and economic situations. We pursue a people-oriented, meticulous manufacturing, brainstorm, construct brilliant organization. hilosophy. Strict high quality management, whole heartedly service, reasonable cost in Myanmar is our stand on the premise of competition. If vital, welcome to make contact with us by our web page or telephone consultation, we are going to be pleased to serve you.
1, WARRANTY TERMS:
1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE
1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.
2, DELIVERY CONDITIONS:
2.1 DELIVERY CONDITION: FOB QINGDAO PORT.
2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
2.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.
3, INSPECTION:
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.
4, INSTALLATION AND EQUIPMENT COMMISSIONING:
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.
If any interest to our machines, please kindly feel free to contact us:
Email: info@tongsanextruder.com info@wpcmachinery.com
Phone: 0086-13953226564
TEL:0086-532-82215318
Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China
By Sara from Detroit - 2018.09.19 18:37
High Quality, High Efficiency, Creative and Integrity, worth having long-term cooperation! Looking forward to the future cooperation!
By Arabela from Kuwait - 2017.03.28 16:34