Corrugated pipe machine HDPE/PVC double wall corrugated pipe machine

Short Description:

Material : HDPE/PVC Application: instead of concrete pipe and iron pipe Production process: Loader--- extruder---Die---Forming moulds---cutter (optional)---D...


  • FOB Price: US $20,000-100,000/set
  • Min.Order Quantity: 1 set
  • Supply Ability: 10 sets per month
  • Port: Qingdao
  • Payment Terms: L/C,D/A,D/P,T/T
  • Product Detail

    Service and support

    Inquiry and contact

    Product Tags

    Material : HDPE/PVC
    Application: instead of concrete pipe and iron pipe
    Production process:
    Loader--- extruder---Die---Forming moulds---cutter (optional)---Double working station winder (optional)---stacker(optional)

    Good cooling system

    dwc pipe machine die head cooling corrugated pipe production line_副本 dwc pipe machie extruder dwc pipe machine clamping steel panel corrugated pipe machine template
    Technique parameter:

    HDPE 40-160mm
    Model SJSBWG-110 SJBWG-160
    Pipe diameter 40-110 75-160
    extruder SJ63/33+SJ65/33 SJ65/33+SJ90/33
    Quantity of mould blocks 72 72
    Forming die Co extrusion die
    HDPE and PVC
    Model SBWG-110 SBWG-250
    Pipe diameter mm 50-110 75-250
    Extruder model SJ63/33+SJ65/33 for HDPESJSZ65/132 for pvc SJ65/33+SJ75/33 for HDPESJSZ80/156 for pvc

  • Previous:
  • Next:

  • 1, WARRANTY TERMS: 

    1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE

    1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.

    1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.

    2, DELIVERY CONDITIONS:

    2.1 DELIVERY CONDITION: FOB QINGDAO PORT.

    2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF  ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.

    2.3 SUPERVISION OF LOADINGTHE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.

    3, INSPECTION: 

    WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST  FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.

    4, INSTALLATION AND EQUIPMENT COMMISSIONING: 

    IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.

    If any interest to our machines, please kindly feel free to contact us:

    Email: info@tongsanextruder.com       info@wpcmachinery.com

    Phone: 0086-13953226564
    TEL:0086-532-82215318

    Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China

  • WhatsApp Online Chat !