High Performance Sheet Cutting Machine - PE PP PPR pipe machine PE gas pipe making machine – WOOD-PLASTIC Detail:
Gas and water supplying pipe extrusion line is used for producing wanter and gas supplying pipe
have the feature of heat resistance ,anti-aging,strong mechanical strength,resistance to environment stress fracture and squirm,etc.
the technical parameter following the below:
|
SJ-65B |
SJ-90B |
SJ-120B |
SJ-150B |
MAX. specification |
110 |
200 |
400 |
630 |
Marking line machine model |
SJ-25 |
SJ-30 |
SJ-30 |
SJ-30 |
Max.output |
90-180 |
200-320 |
320-500 |
550-700
|
Product detail pictures:
Related Product Guide:
Acrylic Plastic Sheets
The Insider Scoop on a Vacuum Formable Plastic Sheet
Our eternal pursuits are the attitude of regard the market, regard the custom, regard the science as well as the theory of quality the basic, believe in the 1st and management the advanced for High Performance Sheet Cutting Machine - PE PP PPR pipe machine PE gas pipe making machine – WOOD-PLASTIC, The product will supply to all over the world, such as: Pakistan, Panama, Croatia, Upon today, we have customers from all over the world, including USA, Russia, Spain, Italy, Singapore, Malaysia, Thailand, Poland, Iran and Iraq. The mission of our company is to provide the high quality products with lower price. We are looking forward to doing business with you!
1, WARRANTY TERMS:
1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE
1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.
2, DELIVERY CONDITIONS:
2.1 DELIVERY CONDITION: FOB QINGDAO PORT.
2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
2.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.
3, INSPECTION:
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.
4, INSTALLATION AND EQUIPMENT COMMISSIONING:
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.
If any interest to our machines, please kindly feel free to contact us:
Email: info@tongsanextruder.com info@wpcmachinery.com
Phone: 0086-13953226564
TEL:0086-532-82215318
Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China
By Helen from Russia - 2018.12.22 12:52
We are old friends, the company's product quality has been always very good and this time the price is also very cheap.
By Margaret from Portugal - 2017.05.21 12:31