Original Factory Wpc/pvc Foam Frame Fiberglass Door - Corrugated pipe machine HDPE/PVC double wall corrugated pipe machine – WOOD-PLASTIC Detail:
Material : HDPE/PVC
Application: instead of concrete pipe and iron pipe
Production process:
Loader--- extruder---Die---Forming moulds---cutter (optional)---Double working station winder (optional)---stacker(optional)
Technique parameter:
HDPE 40-160mm | ||
Model | SJSBWG-110 | SJBWG-160 |
Pipe diameter | 40-110 | 75-160 |
extruder | SJ63/33+SJ65/33 | SJ65/33+SJ90/33 |
Quantity of mould blocks | 72 | 72 |
Forming die | Co extrusion die |
HDPE and PVC | ||
Model | SBWG-110 | SBWG-250 |
Pipe diameter mm | 50-110 | 75-250 |
Extruder model | SJ63/33+SJ65/33 for HDPESJSZ65/132 for pvc | SJ65/33+SJ75/33 for HDPESJSZ80/156 for pvc |
Product detail pictures:
Related Product Guide:
Why Do People Prefer PVC Pipes For Various Purposes
PVC Pipes Measurements
Our rewards are reduce selling prices,dynamic revenue team,specialized QC,sturdy factories,superior quality services for Original Factory Wpc/pvc Foam Frame Fiberglass Door - Corrugated pipe machine HDPE/PVC double wall corrugated pipe machine – WOOD-PLASTIC, The product will supply to all over the world, such as: Slovakia, Chicago, European, Our company insists on the purpose of takes service priority for standard, quality guarantee for the brand, do business in good faith, to provide professional, rapid, accurate and timely service for you. We welcome old and new customers to negotiate with us. We will serve you with all sincerity!
1, WARRANTY TERMS:
1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE
1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.
2, DELIVERY CONDITIONS:
2.1 DELIVERY CONDITION: FOB QINGDAO PORT.
2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
2.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.
3, INSPECTION:
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.
4, INSTALLATION AND EQUIPMENT COMMISSIONING:
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.
If any interest to our machines, please kindly feel free to contact us:
Email: info@tongsanextruder.com info@wpcmachinery.com
Phone: 0086-13953226564
TEL:0086-532-82215318
Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China
By Olga from Adelaide - 2017.08.28 16:02
It is a very good, very rare business partners, looking forward to the next more perfect cooperation!
By Naomi from Salt Lake City - 2018.11.04 10:32