Plastic recycling machine PP PE PS PC ABS cold granulating production line

Short Description:

Plastic cold cut granulating production line Brief Introduction This machine line is mainly used for plastic with high melt index and high viscosity such a...


  • FOB Price: US $20,000-100,000/set
  • Min.Order Quantity: 1 set
  • Supply Ability: 10 sets per month
  • Port: Qingdao
  • Payment Terms: L/C,D/A,D/P,T/T
  • Product Detail

    Service and support

    Inquiry and contact

    Product Tags

    Plastic cold cut granulating production line

    Plastic granulating machine plastic graunlater
    Brief Introduction
    This machine line is mainly used for plastic with high melt index and high viscosity such as PP,PE,PS,HIPS,ABS,PC etc.It adopts parallel double screw extruder and single screw extruder,the specially designed screw is applicable to the granulating ,dyeing.reproduction for various materials.Hob cutting type granule cutter is characterized by stable rotation,even cutting ,energy and electricity saving and safely operating etc.
    We can make different types extruder  according to the customized production output.
    The specially design mould makes the granules more even.
    The specially designed blade and hardening treatment make the lifespan of the equipment longer.

     


  • Previous:
  • Next:

  • 1, WARRANTY TERMS: 

    1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE

    1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.

    1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.

    2, DELIVERY CONDITIONS:

    2.1 DELIVERY CONDITION: FOB QINGDAO PORT.

    2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF  ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.

    2.3 SUPERVISION OF LOADINGTHE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.

    3, INSPECTION: 

    WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST  FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.

    4, INSTALLATION AND EQUIPMENT COMMISSIONING: 

    IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.

    If any interest to our machines, please kindly feel free to contact us:

    Email: info@tongsanextruder.com       info@wpcmachinery.com

    Phone: 0086-13953226564
    TEL:0086-532-82215318

    Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China

  • WhatsApp Online Chat !